Skip to main content
NetApp Knowledge Base

CFBMC-2358: Both AFF A250 nodes boot to backup firmware image (15.95P1) following AC power cycle

Views:
Visibility:
Public
Votes:
0
Category:
ontap-9
Specialty:
hw
Last Updated:

Issue

  • On AFF A250 systems, both nodes might unexpectedly boot from the backup SPI flash recovery image instead of the Primary SPI flash image following an AC power cycle event.
  • The backup image version uses a 15.9<n> format – e.g. 15.95P1
  • When this occurs, the BMC operates in a recovery/fallback state, which may result in reduced management functionality or version inconsistency between the active BMC firmware and the expected production image.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.