LACP ifgroup ports are stuck down following ONTAP upgrade
Applies to
- FAS/AFF
- ONTAP 9
- Data ports in an ifgroup using LACP
Issue
- Following the ONTAP upgrade and giveback, two of the data ports in an ifgroup are stuck in the down state
- Bouncing the ports on the node and the switch, removing and re configuring the LACP on the switch and performing TO/GB of the node with the issue yields no results
- The switch reports:
Feb 3 10:27:57.950: %switch: Gi1/0/18 suspended: LACP currently not enabled on the remote port.
Feb 3 10:27:58.738: %switch: Gi1/0/17 suspended: LACP currently not enabled on the remote port.