Skip to main content
NetApp Knowledge Base

VIFMGR offline migrating cluster switch CN1610 to BES-53248

Views:
364
Visibility:
Public
Votes:
0
Category:
fabric-interconnect-and-management-switches
Specialty:
hw
Last Updated:

Applies to

  • Cluster Network Switch (CNS) hardware upgrade
  • CN1610
  • BES-53248

Issue

  • Several LIFs in operational status down.
  • Downtime in several services for the SVMs affected.
  • Cluter ping fails due to disabled ISLs between switches while still connecting the nodes.
  • VIFMGR offline, some interfaces migrated or operational status down. Example:

Wed Jun 23 2021 09:27:18 +02:00 [kern_vifmgr:info:7192] [0x80bae2900] [FailoverMgr::cluster_check] 100% packet loss when pinging from node1_lif1 ( 169.254.137.239 ) on node1 -> node3_lif2 ( 169.254.16.239 ) on node3
Wed Jun 23 2021 09:27:19 +02:00 [kern_vifmgr:info:7192] [0x80bae2900] [FailoverMgr::cluster_check] l2ping failed e0a on node1 -> e0b on node3 result='remote interface is down or unreachable. If a VLAN was specified, it may not be configured on the switch.'
Wed Jun 23 2021 09:27:42 +02:00 [kern_vifmgr:info:7192] [0x80bae2900] [FailoverMgr::cluster_check] 100% packet loss when pinging from node1_lif1 ( 169.254.137.239 ) on node1 -> node4_lif2 ( 169.254.128.136 ) on node4
Wed Jun 23 2021 09:27:44 +02:00 [kern_vifmgr:info:7192] [0x80bae2900] [FailoverMgr::cluster_check] l2ping failed e0a on node1 -> e0b on node4 result='remote interface is down or unreachable. If a VLAN was specified, it may not be configured on the switch.'
Wed Jun 23 2021 09:28:07 +02:00 [kern_vifmgr:info:7192] [0x80bae2900] [FailoverMgr::cluster_check] 100% packet loss when pinging from node1_lif1 ( 169.254.137.239 ) on node1 -> node2_lif2 ( 169.254.63.209 ) on node2
Wed Jun 23 2021 09:28:08 +02:00 [kern_vifmgr:info:7192] [0x80bae2900] [FailoverMgr::cluster_check] l2ping failed e0a on node1 -> e0c on node2 result='remote interface is down or unreachable. If a VLAN was specified, it may not be configured on the switch.'
Wed Jun 23 2021 09:28:32 +02:00 [kern_vifmgr:info:7192] [0x80bae2900] [FailoverMgr::cluster_check] 100% packet loss when pinging from node1_lif1 ( 169.254.137.239 ) on node1 -> node2_lif2 ( 169.254.136.171 ) on node2
Wed Jun 23 2021 09:28:33 +02:00 [kern_vifmgr:info:7192] [0x80bae2900] [FailoverMgr::cluster_check] l2ping failed e0a on node1 -> e0c on node2 result='remote interface is down or unreachable. If a VLAN was specified, it may not be configured on the switch.'
...
Wed Jun 23 2021 09:35:03 +02:00 [kern_vifmgr:info:6719] [0x80b970b00] [Net::RdbLifHandle::avoidDownPorts] LIF lif:rdb:4294967293:node2_lif2 (947) is assigned to a down port (node2:e0c). Attempting to reassign.
...
Wed Jun 23 2021 09:35:14 +02:00 [kern_vifmgr:info:6719] A [src/rdb/TM.cc 1760 (0x80bf51600)]: _triggerOnlineStatusCallback: FAILOVER rdb: Local unit VifMgr offline
Wed Jun 23 2021 09:35:14 +02:00 [kern_vifmgr:info:6719] Notice: online_status_callback: RDB unit is offline
...
Wed Jun 23 2021 09:35:14 +02:00 [kern_vifmgr:info:6719] [0x80b970b00] [EventMgr::workerThreadMain] received port table update while OFFLINE
...
Wed Jun 23 2021 09:35:18 +02:00 [kern_vifmgr:info:6719] A [src/rdb/TM.cc 1787 (0x810d52700)]: _triggerOnlineStatusCallback: FAILOVER rdb: Local unit VifMgr online
Wed Jun 23 2021 09:35:18 +02:00 [kern_vifmgr:info:6719] A [src/rdb/cluster_events.cc 88 (0x810d52700)]: Report: Cluster event: node-event, epoch 19, site 1007 [local node online (secondary)].
Wed Jun 23 2021 09:35:18 +02:00 [kern_vifmgr:info:6719] Notice: online_status_callback: RDB unit is online as Secondary

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.