Skip to main content
NetApp Knowledge Base

How to cable an IOM12E platform with IOM6 and IOM12 storage shelves in Multi-Path HA

Views:
5,866
Visibility:
Public
Votes:
4
Category:
fas-systems
Specialty:
hw
Last Updated:

Applies to

  • I/O Module (IOM) transitions from IOM12E platforms to IOM6 shelves
  • IOM12E platforms (embedded IOM12 shelf)
    • FAS2650, FAS2620
    • FAS2750, FAS2720
    • AFF A220, AFF A200
  • IOM6 shelves
    • DS2246, DS4246, DS4486
  • IOM12 shelves
    • DS224C, DS212C, DS460C

Description

When creating or adding a shelf stack to an IOM12E platform with IOM12-equipped shelves, any IOM6-equipped shelves in the stack must be cabled in a specific order to avoid pathing issues.

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.