Skip to main content
NetApp Knowledge Base

Active IQ Unified Manager events "Node To FC Switch All FC-Initiator Links Down" and "Node To FC Switch All FC-VI Interconnect Links Down"

Views:
919
Visibility:
Public
Votes:
1
Category:
oncommand-unified-manager
Specialty:
legacy
Last Updated:

Applies to

  • Active IQ Unified Manager
  • OnCommand Unified Manager 9.5 and below
  • ONTAP 8.3 and later in MetroCluster configuration

Issue

  • MetroCluster events in Unified Manager do not become obsolete after resolving them
  • The events include but may not be limited to the following:

Node To FC Switch All FC-Initiator Links Down
Node To FC Switch All FC-VI Interconnect Links Down

  • New instances of these may be created after marking events as resolved but the associated condition is not observed or has already been fixed on the clusters and MetroCluster fabric devices.

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.