Skip to main content
NetApp Knowledge Base

Link does not come up either end when converting to switched cluster

Views:
18
Visibility:
Public
Votes:
0
Category:
ontap-9
Specialty:
hw
Last Updated:

Applies to

  • AFF/FAS
  • BES-53248

Issue

  • Link doesn't come online when converting from switchless FAS2620 to switched BES-53248.
  • Verified the RCF version installed is supported.
  • Verified that supported cable and SFP are used on both ends.
  • Procedure from the document was followed.
  • Tried swapping the cables on both ends. 
  • No changes when connected to different interfaces on the switch.
  • Executed shut/no shut on switch side.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.