Skip to main content
NetApp Knowledge Base

Both nodes down after power outage and will not boot

Views:
216
Visibility:
Public
Votes:
0
Category:
fas-systems
Specialty:
hw
Last Updated:

Applies to

  • FAS 8200

Issue

  • Both nodes were halted without takeover for power maintenance
  • Node A is completely unresponsive and will not POST
  • Node B shows the following errors on console:

Loading Device Drivers ...
BIOS Version: 11.1
Portions Copyright (C) 2014-2017 NetApp, Inc. All Rights Reserved.

Initializing System Memory ...
BIOS Version: 11.1
Portions Copyright (C) 2014-2017 NetApp, Inc. All Rights Reserved.

Initializing System Memory ...
BIOS Version: 11.1
Portions Copyright (C) 2014-2017 NetApp, Inc. All Rights Reserved.

Initializing System Memory ...
Loading Device Drivers ...
Waiting for SP ...
Configuring Devices ...

Jan 10 23:39:00 [node-01:monitor.globalStatus.critical:EMERGENCY]: Power Supply Status Critical: PSU1, PSU2.
Supply Status Critical: PSU1, PSU2.
****************************
* Power Fail - Please Wait *
****************************

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.