Weblinker process termination alerts seen in Brocade switch due to flow control being disabled
Applies to
- Brocade switch
 - FABOS 9.2.1a
 
Issue
- Below errors are seen in errdump.
 
2025/03/20-07:10:16 (IST), [KSWD-1002], 5403077, SLOT 1 | FFDC | CHASSIS, WARNING, switch1, Detected termination of process 0.weblinker.fcg:12176.
2025/03/20-07:10:16 (IST), [RAS-1001], 5403078, SLOT 1 | CHASSIS, INFO, switch1, First failure data capture (FFDC) event occurred.
2025/03/20-07:10:30 (IST), [LOG-1000], 5403079, SLOT 2 | FID 128, INFO, switch1, Previous message repeated 9 time(s).
2025/03/20-07:11:08 (IST), [USWD-1002], 5403080, SLOT 1 | CHASSIS, INFO, switch1, System component fcsw:weblinker restart completed.
- This weblinker termination is seen as defect in Brocade FABOS 9.1.1b
 - But the switch is already on version which is fix for defect in 9.1.1b.
 - Flow monitor is disabled and weblinker core file is too big over 900M.
 
