Skip to main content
NetApp Knowledge Base

Weblinker process termination alerts seen in Brocade switch due to flow control being disabled

Views:
58
Visibility:
Public
Votes:
0
Category:
fabric-interconnect-and-management-switches
Specialty:
brocade
Last Updated:

Applies to

  • Brocade switch
  • FABOS 9.2.1a

Issue

  • Below errors are seen in errdump.

2025/03/20-07:10:16 (IST), [KSWD-1002], 5403077, SLOT 1 | FFDC | CHASSIS, WARNING, switch1, Detected termination of process 0.weblinker.fcg:12176.
2025/03/20-07:10:16 (IST), [RAS-1001], 5403078, SLOT 1 | CHASSIS, INFO, switch1, First failure data capture (FFDC) event occurred.
2025/03/20-07:10:30 (IST), [LOG-1000], 5403079, SLOT 2 | FID 128, INFO, switch1, Previous message repeated 9 time(s).
2025/03/20-07:11:08 (IST), [USWD-1002], 5403080, SLOT 1 | CHASSIS, INFO, switch1, System component fcsw:weblinker restart completed.

  • This weblinker termination is seen as defect in Brocade FABOS 9.1.1b
  • But the switch is already on version which is fix for defect in 9.1.1b.
  • Flow monitor is disabled and weblinker core file is too big over 900M.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.