Skip to main content
NetApp Knowledge Base

ANDU fails with updateVvolTableDefaults timeout

Views:
135
Visibility:
Public
Votes:
0
Category:
ontap-9
Specialty:
CORE
Last Updated:

Applies to

  • ONTAP 9
  • Large/scaled-out cluster
  • Very large volume counts

Issue

  • When upgrading large scale environments, with high volume counts, an ANDU process may fail due to the error below:
1200 post-apps  aborted  Timeout: Operation "updateVvolTableDefaults_iterator::create_imp()" took longer than 25 seconds to complete [from mgwd on node "node_name" (VSID: -3) to vldb at 127.0.0.1]

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.