Skip to main content
NetApp Knowledge Base

Switchback simulate causes config-replication resync to report failed

Views:
25
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

Applies to

  • ONTAP 9
  • MetroCluster IP

Issue

While performing checks after recovering from a non-controller failure in an MCCIP environment, the output of 'metrocluster config-replication resync-status show' reports failed.
 

NetApp1-MCC::*> metrocluster switchback -simulate true
[Job 26347] Job succeeded: Switchback simulation is successful.

NetApp1-MCC::*> metro config-replication resync-status show
(metrocluster config-replication resync-status show)
Source Destination State % Complete
----------------------- ----------------------- ----------- ----------
NetApp1-MCC NetApp2-MCC failed -
NetApp2-MCC NetApp1-MCC failed -

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.