Switchback not possible after FAS8080 to FAS9000 headswap
Applies to
- FAS8080
- FAS9000
- Fabric Metrocluster
- ONTAP 9
Issue
Switchback failed with this error:
Error: failed to validate the node and cluster components before the switchback operation.
operation timed out while waiting for Vserver configuration synchronization to complete.