MetroCluster FC to IP transition - Option 9c Failing
- Views:
- 300
- Visibility:
- Public
- Votes:
- 0
- Category:
- metrocluster
- Specialty:
- metrocluster
- Last Updated:
- 11/23/2020, 7:59:44 PM
Applies to
- MetroCluster
- Transition from 2-node FC to 4-node IP
- Option 9c failing
Issue
During the procedure to transition a 2-node MetroCluster FC to a 4-node MetroCluster IP, the step to run option 9c after connecting the new IP controllers to the existing shelves fails.