CONTAP-726474: MetroCluster IP Switchover Can Fail When Vserver Configuration Is Not Synchronized
Issue
A negotiated MetroCluster IP switchover can fail with a non-overridable veto if Vserver configuration synchronization does not complete in time. The affected Vservers may remain in a
syncing or recovering state, preventing the switchover and affecting disaster-recovery operations.