D_Port test in NOT STARTED state
Applies to
- Brocade switches
- Fabric MetroCluster
Issue
When running the D_Port test, it remains in a 'NOT STARTED' state.
Example:
S1Switch01:admin> portdporttest --show 0
D-Port Information:
===================
Port:                           0
Remote WWNN:                    10:00:d8:1f:cc:10:86:2a
Remote port index:              0
Mode:                           Automatic
No. of test frames:             1 Million
Test frame size:                1024 Bytes
Pattern:                        jCRPAT
FEC (enabled/option/active):    Yes/No/No
CR (enabled/option/active):     Yes/No/No
Start time:                     Mon Dec  7 13:26:16 2020
End time:                       -------------------
Status:                         NOT STARTED
================================================================================
Test                    Start time      Result          EST(HH:MM:SS)   Comments
================================================================================
Electrical loopback     --------        NOT STARTED     --------        ----------
Optical loopback        --------        NOT STARTED     --------        ----------
Link traffic test       --------        NOT STARTED     --------        ----------
================================================================================
Roundtrip link latency:         unknown
Egress power:                   Tx: -2.0 dBm, Rx: Not Avail.
Ingress power:                  Rx: -4.8 dBm, Tx: Not Avail.
S2Switch01:admin> portdporttest --show 0
D-Port Information:
===================
Port:                           0
Remote WWNN:                    10:00:d8:1f:cc:10:86:2a
Remote port index:              0
Mode:                           Automatic
No. of test frames:             1 Million
Test frame size:                1024 Bytes
Pattern:                        jCRPAT
FEC (enabled/option/active):    Yes/No/No
CR (enabled/option/active):     Yes/No/No
Start time:                     Mon Dec  7 13:26:31 2020
End time:                       -------------------
Status:                         NOT STARTED
================================================================================
Test                    Start time      Result          EST(HH:MM:SS)   Comments
================================================================================
Electrical loopback     --------        NOT STARTED     --------        ----------
Optical loopback        --------        NOT STARTED     --------        ----------
Link traffic test       --------        NOT STARTED     --------        ----------
================================================================================
Roundtrip link latency:         unknown
Egress power:                   Tx: -2.5 dBm, Rx: Not Avail.
Ingress power:                  Rx: -3.5 dBm, Tx: Not Avail.
