7MTT copy-based transition: How to add a manually baselined volume to a new project or move an already based volume from one project to a new project
Applies to
- 7-Mode Transition Tool
- SnapMirror
Description
The article describes how to add a manually baselined volume to a new project or move an already based volume from one project to a new project
The following are the two cases:
- Case 1: Customer needs to move an already baselined volume from an existing project into a new project.
- Case 2: Customer needs to add a manually baselined clustered Data ONTAP volume into a project/session.
The following preconditions must be met before proceeding with the steps:
- The volume in question must have been already baselined (SnapMirror state in 'snapmirrored'). The 7-to-C SnapMirror relationship for this volume must be active and is not broken or deleted.
- Document the 7-Mode IP address/FQDN that was used for the baselined volume's 7-to-C SnapMirror relationship. The exact same IP address/FQDN must be provided as data-copy IP address while creating the new project/session.