Scheduled back ups no longer run after failed SnapCenter 6.x upgrade
Applies to
- SnapCenter Server (SC) 6.0 and later
- SnapCenter Plug-in for Microsoft Windows (SCW) 6.0 and later
- SnapCenter Plug-in for Microsoft SQL Server (SCSQL) 6.0 and later
- SnapCenter Plug-in for Microsoft Exchange Server (SCE) 6.0 and later
Issue
Scheduled back ups for Windows-based plug-in hosts no longer run if a SnapCenter upgrade from 4.9 or 5.0 to 6.x fails, and the SnapCenter server is reverted to a snapshot taken before the upgrade.
