Skip to main content
NetApp Knowledge Base

MetroCluster FC to IP transition - Option 9c Failing

Views:
172
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

Applies to

  • MetroCluster
  • Transition from 2-node FC to 4-node IP
  • Option 9c failing

Issue

During the procedure to transition a 2-node MetroCluster FC to a 4-node MetroCluster IP, the step to run option 9c after connecting the new IP controllers to the existing shelves fails.

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

Scan to view the article on your device