Skip to main content
NetApp Knowledge Base

Scheduled Email Cognos report in HTML or other formats return with error CNC-SDS-0423

Views:
274
Visibility:
Public
Votes:
0
Category:
oncommand-insight-data-warehouse
Specialty:
legacy
Last Updated:

Applies to

OnCommand Insight 7.3.x (OCI)

Data warehouse (DWH)

Cognos Reporting Portal

Issue

Scheduled HTML format report comes in email as a txt file attachment with the following error:

CNC-SDS-0423 The attachment 'Report_Name.html', in 'text/html; charset=utf-8' format, of size 23.09MB was missing from the request. It was probably removed due to exceeding a maximum size setting on the sending service.

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.