Why was there no Automatic Switchover while the site went down?
Applies to
- MetroCluster
- Cluster shut down due to overtemperature issue
- Automatic Unplanned Switchover (AUSO) not triggered
Answer
- Shut down caused by overtemperature is classified as environmental shutdown, which is considered a graceful, and AUSO is not triggered
- AUSO will only be triggered if the storage at the disaster site is accessible.
- AUSO functionality can be achieved by using a functional third site arbitrary solution like Tiebreaker or ProLion Solution