Switchback vetoed after FCVI replacement
- Views:
- 345
- Visibility:
- Public
- Votes:
- 0
- Category:
- metrocluster
- Specialty:
- metrocluster
- Last Updated:
- 6/6/2022, 12:18:57 PM
Applies to
- MetroCluster FC
- virtual interface over Fibre Channel (FC-VI) card replacement
Issue
- The FC-VI Card was replaced in one of the two node MetroCluster FC
- Attempting to switch back fails with the error message:
Errors: Failed to validate the node and cluster components before the switchback operation.
node1 (non-overridable veto): Failed to read DR partner state. Verify that the Fibre Channel interconnect is up and retry the operation.
- ClusterA-01 (Which took over ClusterA-02) does not have an address in the output of
metrocluster interconnect adapter show