Switchback fails during head swap due to "DR partner is not ready"
Applies to
- Fabric MetroCluster
- ONTAP 9
- Headswap from FAS9000 to FAS9500
Issue
- During the headswap process, switchback operation fails with reason:
Errors: Failed to validate the node and cluster components before the switchback operation.ClusterA::NodeA (non-overridable veto): The DR partner is not ready for the switchback operation. Contact technical support for assistance.