Skip to main content
NetApp Knowledge Base

Not able to perform switchback during headswap procedure

Views:
252
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

Applies to

  • two-node MetroCluster head upgrade
  • From AFF8040 to AFF300
  • switchover state

Issue

During upgrade of the first node not able to perform metrocluster switcback

Failed to validate the node and cluster components before the switchback operation.
(non-overridable veto): The DR partner is not ready for the switchback

MetroCluster node show reports new node in normal state instead of waiting for switchback

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.