Skip to main content
NetApp Knowledge Base

Metrocluster IP Switchback fails with ReceiverThread failed to process baseline

Views:
15
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

Applies to

  • ONTAP 9.15.1P7
  • MetroCluster (MCC) IP
  • AFF-A400 platforms

Issue

  • System in a fix version for defect CONTAP-62147 encountered the same symptoms.
  • MetroCluster switchback operation fails.
  • Error is observed during metrocluster operation show or metrocluster switchback-simulate:

Errors: Failed to setup the node and cluster components for the switchback operation.clusterA(fatal): A stream operation timed out. Error: Failed to sync configuration on cluster "clusterB". Error on "receiver" stream: (ReceiverThread failed to process baseline message on streamID. Error: duplicate entry).

  • MCC configuration replication resync is stuck (messaging on one site and failed on the other). metrocluster check show displays warnings for config-replication and clusters.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.