MetroCluster new ATTO bridge powers off intermittently
Applies to
- Fabric MetroCluster
- ONTAP 9
- New ATTO 7500N/7600N fibrebridge
Issue
- The new ATTO bridge powers off intermittently, sometimes with as little as 5 minutes between instances.
- Power cycling does not resolve the issue.