Skip to main content
NetApp Knowledge Base

How to upgrade both firmware and RCF files on BES 52348 switches, a step-by-step guide

Views:
405
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

 

Applies to

Broadcom BES-53248 switches
Metrocluster IP

Description

This is a step-by-step guide to upgrading in-production BES-53248 Metrocluster IP switches.

Metrocluster IP deployments use a total of 4 switches to provide two independent storage fabrics for MetroCluster:
• Cluster interconnect
• MetroCluster IP network

There are 2 switches used per site.

metrocluster.jpg

Site A: Switches A1 and A2
Site B: Switches B1 and B2

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.