FCVI port remains down after SFP replacements and takeover and giveback
Applies to
- MetroCluster FC
- ONTAP 9
- FC-VI port down
- FC-VI port and switch port SFPs and optical cable have been replaced.
Issue
- The FC-VI port is down and remains down after node and switch SFPs and cable have been replaced.
- The steps in FCVI Port in Down State after SFP replacements have been followed and the port remains down.