2-node MetroCluster upgrade to 9.8 and higher - switchback timeout
Applies to
- 2-nodes metrocluster
- Automated Non Disruptive Upgrade (ANDU) procedure
Issue
- The partner node in switchover is reporting a switchback error due to timeout
- The automated switchback operation fails