Skip to main content
NetApp Knowledge Base

CONTAP-285907: During controller upgrade, e3a or e3b cluster ports on AFF A400 do not link up when connected to cluster ports on new node

Views:
7
Visibility:
Public
Votes:
0
Category:
ontap-9
Specialty:
CORE
Last Updated:

Issue

  • For controller upgrade from an AFF A400 to an AFF A30 or AFF A50, 40GbE or 100GbE cluster connections are required between old and new nodes.
  • During a controller upgrade in a two-node AFF A400 switchless cluster, 100GbE e3a or e3b cluster ports on AFF A400 nodes might not link up when connected to 40/100GbE ports on AFF A30 or AFF A50 nodes.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.