Switch BES-53248 went down after the switch reboot
- Views:
- 45
- Visibility:
- Public
- Votes:
- 0
- Category:
- ontap-9
- Specialty:
- MetroCluster
- Last Updated:
- 7/13/2024, 5:03:02 PM
Applies to
- FAS/AFF systems
- ONTAP 9
- BES-53248 cluster switch
Issue
- After the planned switch reboot activity, the BES switch went down.
- Not able to ping the switch or connect via SSH.
- Physical inspection of the Brocade switch indicates no power or LEDs.