Why after initializing SVM-DR destination SVM LIF’s are shown as Admin UP/Operational DOWN?
Applies to
- ONTAP
- SVM-DR
Answer
This is expected behavior when the initialization of the SVM-DR finishes.
Additional Information
- The operational status of data LIFs is determined by the status of the SVM with which the data LIFs are associated. When the SVM is stopped, the operational status of the LIF changes to down. When the SVM is started again, the operational status changes to up.
- The status of the destination SVM is stopped.
- Displaying LIF information