Incremental ndmpcopy is interrupted after 4 hours in Phase 4
Applies to
- ONTAP 9.0 and above
- NDMPCopy
Issue
- Incremental NDMPCopy jobs initiated from SP console is interrupted.
- Timeout is consistent across all incremental jobs which is 4 hours after the start of Phase 4.
backup.gz
dmp Mon Mar 14 04:26:18 PDT 2022 ndmpcopy:/vserver/volume/qtree/qc/qtree1/qtree2/ /vserver/dst_volume/qtree/10.114.205.4910.114.205.49(0) Phase_change (IV)
dmp Mon Mar 14 08:29:49 PDT 2022 ndmpcopy:/vserver/volume/qtree/qc/qtree1/qtree2/ /vserver/dst_volume/qtree/10.114.205.4910.114.205.49(0) Log_msg (Write DIRNET for BKP ID=133, type=3 interrupted while at waiting for max inflight. Error = Interrupted system call.)
ndmpd.gz
Mon Mar 14 2022 08:29:49 -07:00 [kern_ndmpd:info:5812] [16256] DEBUG: received CLOSE command from [10.114.205.41].48580