Skip to main content
NetApp Knowledge Base

Search

  • Filter results by:
    • View attachments
    Searching in
    About 1 results
    • https://kb.netapp.com/on-prem/ontap/Ontap_OS/OS-Issues/CONTAP-167423
      Issue The post-apps phase of an ONTAP upgrade of a 2 node MetroCluster aborts due to the sync-destination SVM(s) being config-locked: Mon Dec 04 2023 11:23:31 +01:00 [kern_mgwd:info:3288] 0x839776800:...Issue The post-apps phase of an ONTAP upgrade of a 2 node MetroCluster aborts due to the sync-destination SVM(s) being config-locked: Mon Dec 04 2023 11:23:31 +01:00 [kern_mgwd:info:3288] 0x839776800: 0: INFO: upgrade_revert: [2200,post-apps,2215,mgwd] commit aborted. Reason This operation is not permitted on a Vserver that is configured as the destination of a MetroCluster Vserver relationship.