Aggregate and volume usage increase after the copy-based 7toC transition cutover
Applies to
ONTAP 9
Issue
- After the copy-based 7toC transition cutover, the usage of aggregates and volumes increase.
- This increase can be seen even if the cutover is done with no user access.