Switchback simulation fails - Unable to validate periodic message from DR partner
Applies to
- Fabric MetroCluster
- ONTAP 9
Issue
Switchback simulations fail with an error message
Example:
Example:
ClusterA-01::ClusterA-01 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support.