MetroCluster IP: Unable to validate periodic message from DR partner node
Applies to
- MetroCluster IP
- ONTAP 9
- Shared ISL infrastructure
Issue
When trying to do a switchback operation, the following error is observed
Example:
ClusterA::*> metrocluster operation show Operation: switchback State: failed Start Time: 12/28/2022 15:13:18 End Time: 12/28/2022 15:13:53 Errors: Failed to validate the node and cluster components before the switchback operation. ClusterB::ClusterB-02 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support. ClusterB::ClusterB-01 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support.