How to upgrade both firmware and RCF files on BES 52348 switches, a step-by-step guide
Applies to
Broadcom BES-53248 switches
Metrocluster IP
Description
This is a step-by-step guide to upgrading in-production BES-53248 Metrocluster IP switches.
Metrocluster IP deployments use a total of 4 switches to provide two independent storage fabrics for MetroCluster:
• Cluster interconnect
• MetroCluster IP network
There are 2 switches used per site.
Site A: Switches A1 and A2
Site B: Switches B1 and B2