Controller-replacement job showing Paused after headswap completed due to Verify Details task
Applies to
- ONTAP 9
- Head upgrade
-
Headswap
Issue
- After head upgrade,
job showshowsController-replacement job - Pausedeven thoughsystem controller replace showreportsCompleted:
::*> system controller replace show
Node Status Error-Action
----------------
------------------------ ------------------------------------
Node01 Completed
Node02 Completed
::*> job show
...
106251 Controller-replacement node-01 Node01 Paused
Description: Controller-replacement job.
106254 Controller-replacement node-01 Node02 Paused
Description: Controller-replacement job.
EMSlogs:
[Node01: mgwd: ndo.cr.paused.userInput:notice]: Controller replacement operation has been paused on node "Node01" in "Verify Details" task during "Postcheck" phase for operator intervention.
