Skip to main content
NetApp Knowledge Base

Node unable to join cluster after incomplete initial setup during new installation

Views:
57
Visibility:
Public
Votes:
0
Category:
fas-systems
Specialty:
HW
Last Updated:

Applies to

  • FAS2820
  • ONTAP 9.16
  • New cluster installations
  • Cluster join or initial cluster setup

Issue

  • During the initial setup of a new two-node cluster, cluster configuration was not completed on the first node.
  • After reinstalling and reinitializing the first node, the attempt to join the existing cluster failed.
  • Node remained in a standalone state and only displayed a management interface on port e0M.
  • Cluster setup wizard was exited before all cluster configuration tasks were finished.
  • Subsequent configuration attempts resulted in inconsistent cluster information between both nodes.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.