After power maintenance FC LIF not reachable switch port is healthy
Applies to
- ONTAP
- MetroCluster
- Brocade
- VMware
Issue
- Due to power maintenance all systems shutdown after power was restored during troubleshooting VMware was unable to reach target FC LIF's , all physical ports are up
- LIF shows admin status up and operation status down
- vserver/svm is stopped on a ONTAP node
- MetroCluster health shows waiting for switchback
- FCping commands show not reachable