Unintended scheduled updates are occurring in SnapMirror
Applies to
- ONTAP 9
- SnapMirror
Issue
- There is no schedule configured for the individual SnapMirror relationship.
Note: The schedule field is hyphen ( -
) with this command output.
dst_cluster::> snapmirror show -fields schedule
source-path destination-path schedule
----------------- ------------------ --------
svm_src:vol_src svm_dst:vol_dst -
- However, scheduled-update still occurs periodically:
dst_cluster::> snapmirror show-history
Destination Source Start End
Path Path Operation Time Time Result
----------- ----------- --------- ----------- ----------- -------
svm_dst:vol_dst svm_src:vol_src scheduled-update 8/21/2024 09:05:00 8/21/2024 09:05:02 failure
svm_dst:vol_dst svm_src:vol_src scheduled-update 8/21/2024 08:05:00 8/21/2024 08:05:02 failure
svm_dst:vol_dst svm_src:vol_src scheduled-update 8/21/2024 07:05:00 8/21/2024 07:05:02 failure
svm_dst:vol_dst svm_src:vol_src scheduled-update 8/21/2024 06:05:00 8/21/2024 06:05:03 failure
svm_dst:vol_dst svm_src:vol_src scheduled-update 8/21/2024 05:05:00 8/21/2024 05:05:02 failure