Is it possible to abort the initialize operation on second hop in order to update first hop, and resume initializing second hop from checkpoint?
Applies to
- ONTAP 9
- Cascade SnapMirror
Answer
Yes, it is possible.
- It is possible to abort the second hop and perform an update on the first hop.
- The second hop can be resumed to initialize from checkpoint.
Additional Information
additionalInformation_text
