Takeover is not possible: NVRAM log is not synchronized after switch update Last updated Save as PDF Share Share Tweet Share Views:12Visibility:PublicVotes:0Category:metroclusterSpecialty:metroclusterLast Updated: Applies to MetroCluster IP BES switch Issue Communication issues between the switches in one Fabric.EFOS versions missmatch.