Skip to main content
NetApp Knowledge Base

Storage FC Ports Set to Initiator and No_Sync on Switch Port

Views:
88
Visibility:
Public
Votes:
0
Category:
fabric-interconnect-and-management-switches
Specialty:
brocade
Last Updated:

Applies to

  • Brocade
  • ONTAP

Issue

  • When setting up storage FC ports as initiator, they will not sync properly with a Brocade switch.
  • Switch speeds are different than storage speed, but still compatible. IE 16, 32, 64 port on storage and 4, 8 16 on the switch.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.