It is the customer responsibility to register all the switches purchased from NetApp directly with Cisco or a Cisco reseller as well change entitlements or to renew their systems to get support for th...It is the customer responsibility to register all the switches purchased from NetApp directly with Cisco or a Cisco reseller as well change entitlements or to renew their systems to get support for the switches. If the switch was purchased with Cisco's onsite replacement entitlement, a Cisco onsite field engineer can reconfigure the switch for management access, load the desired NX-OS version, and reload the RCF file if instructed to do so prior to going onsite.
Netapp currently offers 3 models of Mellanox switches to combine with the Netapp HCI: 4:1 Breakout Cables for QSFP Ports for Node Connections 4:1 Breakout Cables for QSFP Ports for Node For SN2700, th...Netapp currently offers 3 models of Mellanox switches to combine with the Netapp HCI: 4:1 Breakout Cables for QSFP Ports for Node Connections 4:1 Breakout Cables for QSFP Ports for Node For SN2700, the Power Supply, the FAN assembly or the full switch can be replaced. Mellanox switches can be found in the IMT but NetApp no longer makes recommendations on the supported version and instead recommends customers run the latest ONYX version.
Please send a request to BroadcomBES@techdata.com, provide the part number and the serial number of each switch that you are looking to buy or check the status of the contract for, the planned time fr...Please send a request to BroadcomBES@techdata.com, provide the part number and the serial number of each switch that you are looking to buy or check the status of the contract for, the planned time frame of the purchase, your name, title/position, company name, address, and phone contact information.
Switched cluster with existing non AFF A320 nodes AFF A320 nodes report takeover is disabled due to unsynchronized log in EMS: monitor.globalStatus.critical: Controller failover of <node> is not possi...Switched cluster with existing non AFF A320 nodes AFF A320 nodes report takeover is disabled due to unsynchronized log in EMS: monitor.globalStatus.critical: Controller failover of <node> is not possible: unsynchronized log. cf.fsm.takeoverOfPartnerDisabled: Failover monitor: takeover of <node> disabled (unsynchronized log). Waiting for <partner-node>, Takeover is not possible: Storage failover interconnect error, NVRAM log not synchronized, Disk inventory not exchanged
Applies to Netapp HCI Mellanox Switches Mellanox Onyx OS Description It is important to keep an offline backup copy of your switch configuration. This configuration can then be restored if mistakes ar...Applies to Netapp HCI Mellanox Switches Mellanox Onyx OS Description It is important to keep an offline backup copy of your switch configuration. This configuration can then be restored if mistakes are introduce in your configuration or in case of full switch failure. This procedure describes the steps taken to backup configuration for Mellanox Onyx-based switches. It is also best practice to save active switch configuration to memory before any switch maintenance activity.
Applies to NetApp SolidFire Storage Nodes NetApp H Series Storage Nodes Description This procedure assumes that your new network switches are able to communicate with your old network switches. The go...Applies to NetApp SolidFire Storage Nodes NetApp H Series Storage Nodes Description This procedure assumes that your new network switches are able to communicate with your old network switches. The goal is to move the SolidFire or HCI storage nodes Bond10G connections for usage on the new network switches. The steps in the procedure below should be done on a per each node, one at a time basis