Skip to main content
NetApp Knowledge Base

Search

  • Filter results by:
    • View attachments
    Searching in
    About 1 results
    • https://kb.netapp.com/on-prem/ontap/DP/SnapMirror/SnapMirror-KBs/Can_SnapMirror_resume_from_the_checkpoint_after_a_path
      Yes, SnapMirror can resume from the checkpoint after a path change when restarting following a pause. Even if the communication path changes, SnapMirror has the capability to resume from the checkpoin...Yes, SnapMirror can resume from the checkpoint after a path change when restarting following a pause. Even if the communication path changes, SnapMirror has the capability to resume from the checkpoint. However, it may be necessary to verify and adjust the settings due to the change in the communication path. After changing the network settings, use the snapmirror show command to check the status of the SnapMirror relationships.