Applies to MetroCluster ONTAP 9 Answer No, switchback is always manual Even if there is a site failure on the active site, no switchback will be performed if the MetroCluster is in switchover state Ad...Applies to MetroCluster ONTAP 9 Answer No, switchback is always manual Even if there is a site failure on the active site, no switchback will be performed if the MetroCluster is in switchover state Additional Information additionalInformation_text