Skip to main content
NetApp Knowledge Base

Search

  • Filter results by:
    • View attachments
    Searching in
    About 1 results
    • https://kb.netapp.com/Legacy/ONTAP/7Mode/Does_7_MTT_require_rebaselining_after_a_physical_relocation_of_7_mode_or_C_mode_systems
      Applies to 7-Mode Transition Tool (7MTT) Answer If the following points are followed, then there is no need to rebaseline: Before relocating the system, pause all the 7MTT jobs and resume them only af...Applies to 7-Mode Transition Tool (7MTT) Answer If the following points are followed, then there is no need to rebaseline: Before relocating the system, pause all the 7MTT jobs and resume them only after the migration is completed. The network and disk configurations must be the same before and after the relocation. 7MTT must be able to connect to the system both 7-mode and C-mode systems from the new location. Additional Information Pausing and resuming a project