Skip to main content
NetApp Knowledge Base

Search

  • Filter results by:
    • View attachments
    Searching in
    About 1 results
    • https://kb.netapp.com/on-prem/ontap/mc/MC-KBs/Metrocluster_won_t_switchback_after_head_upgrade
      Metrocluster FC Controller upgrade Switchback fails during controller upgrade procedure: ClusterA::*> metrocluster operation show Operation: switchback-simulate Errors: Failed to validate the node and...Metrocluster FC Controller upgrade Switchback fails during controller upgrade procedure: ClusterA::*> metrocluster operation show Operation: switchback-simulate Errors: Failed to validate the node and cluster components before the switchback operation. damc2d1::damc2d1-01 (non-overridable veto): The DR partner is not ready for the switchback operation. damc2d1::damc2d1-02 (non-overridable veto): The DR partner is not ready for the switchback operation. Contact technical support for assistance.