Skip to main content
NetApp Knowledge Base

Search

  • Filter results by:
    • View attachments
    Searching in
    About 1 results
    • https://kb.netapp.com/on-prem/ontap/mc/MC-KBs/METROCLUSTER_SWITCHOVER_FAILED_-_negotiated_switchover_incomplete
      After initiating a negotiated switchover (NSO), the operation fails with an error message Errors: Failed to execute the switchover operation for the node components. Cluster_A (fatal): Unable to deter...After initiating a negotiated switchover (NSO), the operation fails with an error message Errors: Failed to execute the switchover operation for the node components. Cluster_A (fatal): Unable to determine the result of the negotiated switchover operation for the remote nodes. Ensure the remote nodes are shut down and then retry the switchover operation with the "-forced-on-disaster true" option. Switchover simulate was successful a matter of seconds/minutes before the NSO operation