Skip to main content
NetApp Knowledge Base

Search

  • Filter results by:
    • View attachments
    Searching in
    About 1 results
    • https://kb.netapp.com/on-prem/ontap/OHW/OHW-KBs/Cluster_port_down__and_CN1610_switch_port_down
      Node port down as seen in sysconfig -a: Switch port down as seen in the switch log: 0/1 Enable 10G Full 10G Full Up Enable Enable long 0/2 Enable 10G Full Down Enable Enable long 0/3 Enable 10G Full 1...Node port down as seen in sysconfig -a: Switch port down as seen in the switch log: 0/1 Enable 10G Full 10G Full Up Enable Enable long 0/2 Enable 10G Full Down Enable Enable long 0/3 Enable 10G Full 10G Full Up Enable Enable long 0/4 Enable 10G Full 10G Full Up Enable Enable long Reseat of the cable between the node port and the switch port brings the link up but port goes down soon after. There is no free switch port available to move the cable to